Skip to content
Enjoy complimentary data migration when switching from your existing bookkeeper or CPA to Institution.

Industry guides

Manufacturing bookkeeping: inventory, cost of goods sold, and margins

Follow material, labor, and overhead costs through raw materials, work in progress, finished goods, and cost of goods sold.

By Institution3 minute readUpdated View sources
In this guide

Show what is raw, unfinished, and ready to sell

A manufacturer can hold steel or fabric on the shelf, parts on the production floor, and completed products in a warehouse. Those are different stages of inventory. Track raw materials, work in process, and finished goods so finance can see where purchases have gone and where cash remains tied up.

Link material receipts and production orders to the item or batch. Reconcile movements and count differences to inventory records rather than waiting for a year-end adjustment large enough to conceal a production issue.

Build a product cost from actual inputs

An item can carry direct materials, direct labor, and appropriate production overhead under the company's accounting policy. Keep selling and administrative activity separate from production costs. If a factory shares equipment across products, document how the overhead is allocated and why the method remains reasonable.

A bill of materials and an expected production time provide a useful baseline. They should be updated when the design, supplier, yield, or process changes, not treated as permanent facts.

Investigate what changed from the expected cost

A material price variance may mean a supplier raised rates or the buyer paid extra for urgent delivery. A usage variance might be scrap, rework, or an inaccurate bill of materials. Labor and machine-hour differences can point to idle time or process problems.

Review unusual variances by job or production batch before rolling them into one broad manufacturing expense. The goal is to know whether prices, production methods, or purchasing quantities need to change.

Reconcile applied overhead at close

A planned overhead rate is an estimate, not proof of actual cost. Compare the overhead assigned to production with the actual costs for the period and investigate the difference. Depending on the accounting framework and materiality, any under- or overapplied amount may affect inventory, cost of goods sold, or both.

Keep the calculation and approval with the close workpapers. Otherwise this month's gross margin may change suddenly when the accountant makes a large adjustment at year-end.

Track goods in transit, scrap, and returns

Inventory can be physically outside the factory but still belong to the company, depending on shipping terms. Record goods in transit, customer returns, damaged units, and supplier credits under the applicable ownership and valuation policy.

Normal production losses and unusual incidents may require different treatment. Document the cause, quantity, disposition, and accounting entry rather than silently reducing stock.

Use the inventory schedule to manage cash

Materials are usually purchased well before the finished goods are sold and paid for. Review purchase commitments, production lead times, finished-goods aging, customer receivables, and supplier due dates together. A profitable order can still require cash the business does not have available.

Manufacturing inventory and capitalization rules can have distinct financial-reporting and tax requirements. Confirm the treatment with the accountant instead of using a generic small-business expense rule.

An example: overhead rate

A shop budgets $240,000 of production overhead and 8,000 direct labor hours, giving an estimated rate of $30 per hour. A job with 12 labor hours receives $360 of applied overhead. If actual overhead is $264,000 at the same hours, $24,000 was underapplied. Finance must reconcile the difference; whether it adjusts inventory, cost of goods sold, or both depends on the accounting policy and materiality.

Frequently asked questions

Do I need a perpetual inventory system?

Most manufacturers benefit from one, because quantities change constantly. Reconcile it to physical counts at least annually.

What is a bill of materials?

A list of the materials and quantities needed to make one unit. It is the basis for standard cost and for detecting usage variances.

How do I treat scrap?

Normal scrap is part of product cost. Unusual scrap, from an equipment failure for example, is generally expensed as a loss.

Sources

Requirements and product details can change. Check the linked guidance for the facts that apply to your situation.

Related reading

Need help with this work?

General information, not personalized accounting, tax, legal, or investment advice. Have the appropriate qualified professional review decisions that depend on your circumstances.